Process parameter
A process parameter is a measurable setting of a manufacturing operation, such as temperature, pressure, speed, feed or time, which is held within limits to get a consistent product.
What it means
Each step of production depends on a few settings that decide whether the output is right. A heat treatment furnace has a temperature and a soak time. An injection moulding machine has barrel temperature, injection pressure and cooling time. The target value and the allowed range are normally fixed on the process sheet. Any drift can spoil the product.
Example
A pickle maker sets bottle sealing at 180°C for 4 seconds. At 150°C the seals leak, and a lot of 2,000 bottles worth ₹80,000 is returned by a distributor.
Records and checks
- Record the actual value of each parameter at the start of the run and at set intervals, with time and operator.
- Verify the instrument is working and calibrated, and compare readings with the target range.
- The operator logs, the shift supervisor checks, and quality reviews any out-of-range entries.
Common mistakes
- Changing a setting to rescue a bad lot without recording it or telling quality.
- Relying on gauges that are not calibrated, so recorded values look correct while the real value differs.