Product requirement
A product requirement is a clear, checkable statement of something a product must do, withstand or achieve, such as capacity, size, life, safety or cost.
What it means
Requirements turn wishes into limits. Each should state one thing, in measurable terms, and be traceable to a source, such as a customer, a standard or the business plan. They are reviewed for conflict. A product that must be both very light and very strong needs a decision about priorities. They then guide design, testing and acceptance, so a missing requirement is usually discovered late and expensively.
Example
A Vijayawada firm designing a rice storage bin lists: holds 50 kg, lid seals against insects, bin wall at least 1.5 mm, stackable two high, usable in humidity up to 85 per cent, sells under ₹850. Each line can be tested, so nobody argues over what good enough means.
Records and checks
- Record the requirement text, value, unit, source and priority, with its approval date.
- Verify that each one can be tested and that no two requirements contradict each other.
- The product owner approves; designers and quality both confirm they understand and can check it.
Common mistakes
- Using words like durable or premium that cannot be measured.
- Bundling several demands in one line, so a partial pass is impossible to judge.