Quality assurance
Quality assurance is the set of planned activities, such as procedures, training, supplier approval and audits, that aim to prevent defects and give confidence that requirements will be met.
What it means
Where quality control looks at the output, quality assurance looks at the system that produces it. It asks whether the right methods exist, whether people are trained, whether materials come from approved sources, and whether the process is audited. Good assurance means fewer defects to find, so less inspection is needed later.
Example
A pickle manufacturer sets up assurance steps: only approved vegetable suppliers, a written recipe with measured salt and oil, hygiene training for new packers every quarter, and a monthly audit of the jar-washing line. Complaints about spoilage drop from nine a month to two.
Records and checks
- Record approved supplier lists, written procedures, training attendance and audit findings.
- Verify that people actually follow procedures by watching the work on the floor.
- The quality head owns the plan, and the owner reviews audit results.
Common mistakes
- Hiring more inspectors and calling it assurance, while the process stays the same.
- Training once at joining and never refreshing it.