Regrind ratio

Regrind ratio is the proportion of reground plastic in a mix with virgin resin, given as a percentage of the total material by weight.

What it means

A higher ratio saves money but can reduce strength, change colour and make the process less stable. A lower ratio is safer but wastes recoverable material. The right ratio depends on the product, the resin and the buyer. A food container or a safety part may allow little or none, while a bucket or crate may take a large share. Customers often specify the maximum.

Example

A crate maker blends 30 kg of regrind with 70 kg of virgin polypropylene, which is a 30 percent ratio. The buyer's specification allows up to 25 percent for its cartons. The quality head cuts the ratio to 25 percent after a drop test shows that the 30 percent crates crack at the handles.

Records and checks

  • Record the weights of virgin and regrind in each batch, the ratio calculated and the product it was used for.
  • Verify the ratio against the customer's limit, and weigh both materials rather than measuring by volume.
  • The operator weighs and mixes, the quality inspector checks the product, and the production head approves any ratio above the standard.

Common mistakes

  • Using one ratio for every product without checking the customer limit.
  • Measuring by scoop, so the real ratio is unknown.