Reserved stock

Reserved stock is a quantity deliberately set aside in the store for a named order, job or customer so that nobody else can issue or sell it.

What it means

Reservation is a protective hold. The goods stay on the books and in the building, but are tagged to a purpose and excluded from free stock. Sales may reserve for a confirmed order, production for a scheduled job, maintenance for a planned shutdown. A reservation needs an owner and an end date, or it locks stock up for ever.

Example

A fabricator has 60 sheets of 3 mm mild steel and 40 are reserved for a tank job starting Monday. A walk-in buyer wanting 30 sheets can be given only 20.

Records and checks

  • Record who reserved the stock, for which order or job, the quantity, date and expiry.
  • Verify weekly that each reservation still has a live order behind it.
  • The planner approves reservations; the stores in-charge releases them when the order is cancelled or completed.

Common mistakes

  • Reserving more than the job needs as a precaution, starving other orders.
  • Not releasing stock after a job is cancelled, so material sits blocked and is bought again.