Rework approval
Rework approval is the written authorisation from a responsible person, usually quality or production head, that allows a rejected lot to be repaired by a stated method and re-inspected.
What it means
Letting operators fix rejected parts on their own can change dimensions, hide defects or break customer terms. A rework approval sets out what is allowed: the lot, the repair method, the limit on attempts and the inspection afterwards. For parts made to a customer drawing, a deviation from it may also need the customer's consent.
Example
A buyer's order for 800 brass fittings has 60 with thread burrs. The quality manager approves deburring and a thread gauge check on all 60. Any piece that still fails is scrapped, and the approval slip is attached to the lot.
Records and checks
- Record the lot number, defect, approved method, approver's name, date and the final result.
- Verify that the rework done follows the approved method and that every piece was re-inspected.
- The quality head approves, and the supervisor confirms the completion.
Common mistakes
- Approving rework verbally, so no one can show who authorised it when a complaint arrives.
- Approving the same defect again and again without asking why it keeps happening.