lamp.
ResourcesPricingAbout

Right first time

Right first time means work is completed correctly at the first attempt, with no rework, correction or repeat visit, and the term is also used as the target for such work.

What it means

It is used as both a goal and a measure. As a goal, it urges teams to build quality into the process rather than inspect it afterwards. As a measure, it is the share of units that need no correction. Typical gains come from clear drawings, trained operators, standard checklists and checking at each step.

Example

A fitting service firm completes 120 installations in a month, and 9 need a second visit to fix a missed item. Right first time is 92.5 percent. A pre-visit checklist for tools and parts is then introduced to lift it to 97 percent.

Records and checks

  • Record the units, the units needing repeat work and the reason code for each.
  • Verify that repeat work is traced back to the original job and not logged as a new one.
  • The supervisor records it, and the owner reviews the main reasons each month.

Common mistakes

  • Treating the phrase as a slogan with no measurement behind it.
  • Judging a job as right when the customer's later complaint is ignored.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →