Runner weight
Runner weight is the weight of the plastic in the runner system that feeds the cavities of a mould, normally counted as part of the shot but not of the finished part.
What it means
In a cold-runner mould, the plastic that fills the channels leading to the cavities hardens and is removed with the parts. It is not sold, so it is waste or regrind. Runner weight is a significant cost when parts are small, because the runner may weigh as much as the parts. Hot-runner moulds avoid it, but cost more to build and maintain.
Example
A 4-cavity mould for small clips has a shot weight of 28 g, with each clip at 4 g, so the runner is 12 g, or 43 percent of the shot. At 6 lakh shots a year, the runner is 7.2 tonnes of resin. A hot-runner system could remove most of it, and the owner compares the payback.
Records and checks
- Record the runner weight per shot, the part weight, the number of cavities and the shot weight.
- Verify by weighing a full shot and the runner separately, and compare against the mould design figure.
- The tool room supplies the design figure, the operator weighs samples, and the planner uses it in costing.
Common mistakes
- Leaving the runner out of material costing, so the cost per part is understated.
- Throwing away clean runners instead of regrinding them where the product allows.