lamp.
ResourcesPricingAbout

Sample rejection

Sample rejection is a laboratory's decision not to test a specimen because it is unfit, such as clotted, leaking, mislabelled, insufficient or too old.

What it means

Testing a poor sample gives a wrong result, so labs refuse it and request a fresh one. Each rejection costs the patient a second draw and delays the report, and it costs the lab collection effort. Labs track rejection reasons by collection centre or collector, because most causes, such as haemolysed blood or wrong tubes, start at the point of collection.

Example

A lab receives a coagulation sample in a plain tube instead of a citrate tube. The technician rejects it, logs the reason, informs the centre by phone, and a fresh sample is collected within two hours. The lab notes the centre has three such cases this month.

Records and checks

  • Record the sample ID, rejection reason, who was informed, the time, and the date of recollection.
  • Verify the rejection against the written criteria so decisions are consistent.
  • The technician rejects, the supervisor reviews rates by centre, and the manager trains the weakest centres.

Common mistakes

  • Testing a doubtful sample to avoid recollection, and releasing an unreliable result.
  • Not telling the centre why, so the same error repeats.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →