Sewing line

A sewing line is a group of operators, machines and helpers arranged in operation sequence to assemble cut garment parts into finished garments.

What it means

A line is usually set up for one style at a time, often with 20 to 60 operators, and led by a line supervisor. Bundles of cut parts enter at one end and move through operations such as collars, sleeves, side seams and hemming. Its layout, balance and skill mix decide output, and a change of style needs a changeover period.

Example

A line of 32 operators in a Tiruppur factory makes 900 polo shirts a day. When a new style comes in, 5 machines are re-threaded and 3 operators are moved, and output takes two days to recover.

Records and checks

  • Record hourly output, operators present, machines running and downtime.
  • Verify that work in progress between operations is not piling up at one spot.
  • The line supervisor tracks it hourly; the production manager reviews daily.

Common mistakes

  • Loading more bundles than the slowest operation can handle, so work piles up.
  • Moving skilled operators between lines without noting the effect on output.