Shade lot
A shade lot is a group of fabric rolls or trims that match in colour shade, kept together so all pieces in one garment or batch look the same.
What it means
Shade differences show most when parts of one garment, or garments in one carton, come from different batches. Quality grades rolls by shade, often as A, B, C or numbers, and the cutting plan uses one shade lot per lay or per size set. Shade lots of fabric and of matching trims such as zips and ribs should also be matched.
Example
Black cotton in a Bhiwandi factory arrives in three shades. The cutting head plans each lay from one shade lot and tickets each bundle with its lot, so no shirt mixes shade 1 collar with shade 3 body.
Records and checks
- Record the shade lot for each roll, the standard compared and the grade.
- Verify with a light box under agreed lighting before cutting.
- Quality grades; the cutting head keeps lots apart.
Common mistakes
- Judging shade under factory tube light instead of the buyer's standard light.
- Putting different lots of body fabric and rib together.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →