Shop order
A shop order is the released instruction to the shop floor to make a specified quantity of an item by a due date, with its materials and sequence of operations.
What it means
The term is used mostly in shops making parts and assemblies to order or in batches. Once a planned order is approved, it becomes a shop order. The floor receives a packet with the drawing, the routing and the material allocation. Progress is reported against it, and costs are collected under its number. It is the same idea as a production or work order and different firms prefer different names.
Example
A Jamnagar brass-parts firm releases shop order 1102 for 3,000 hose connectors, due on the 25th. The packet contains the drawing, bar stock allocation of 410 kg, and operations for turning, threading and inspection. At the end of week one, 1,800 pieces are through threading, and the supervisor reports this against the order.
Records and checks
- Record the shop order number, item, quantity, release and due dates, and the materials allocated.
- Verify that the drawing revision in the packet is current before work starts.
- The planner releases it; the supervisor tracks progress and quality signs the final inspection.
Common mistakes
- Releasing orders before material is available, so jobs stall half-finished on the floor.
- Releasing too many at once, which floods the shop and makes everything late.