Shot blasting

Shot blasting is a surface cleaning process that throws abrasive steel shot at high speed against metal to remove rust, scale and old coating and to roughen the surface.

What it means

It is done in a blasting chamber or by a wheel machine that throws shot onto the part. The result is a clean, uniformly rough surface that helps paint or galvanising stick. Cleanliness is often graded against a visual standard, such as Sa 2.5, and the roughness depends on the shot size. Parts must be coated soon after, because bare blasted steel rusts quickly.

Example

A fabricator of steel frames blasts 40 welded frames before painting. The frames are blasted to Sa 2.5 and primed within four hours. Frames primed the next morning showed flash rust and had to be blasted again.

Records and checks

  • Record the part, abrasive type and size, the cleanliness grade achieved and the time of blasting.
  • Verify the surface against the visual standard, and check dust and oil are removed before coating.
  • The operator blasts, and the painter or inspector accepts the surface before priming.

Common mistakes

  • Letting blasted parts sit in a humid shop for days before priming.
  • Blasting thin sheet with coarse shot, which warps or dents the metal.