lamp.
ResourcesPricingAbout

Single minute exchange of dies

Single minute exchange of dies is a changeover method that aims to complete a die or tooling change in under ten minutes by moving preparation outside machine stoppage.

What it means

It is better read as "single digit minutes", not literally one minute. Steps are sorted into internal ones that need the machine stopped and external ones that can be done while it runs. The goal is to convert as many internal steps as possible into external ones, then simplify the rest.

Example

A sheet-metal job shop in Rajkot takes 55 minutes to change a press tool. By pre-staging the next die, pre-heating clamps and using standard shut heights, it brings the change down to 18 minutes and starts doing batches of 200 instead of 1,000.

Records and checks

  • Record each changeover step, who did it, whether it was internal or external, and its duration.
  • Verify the new method by timing three consecutive changeovers before updating the standard.
  • The production manager owns the target, and operators review the step list monthly.

Common mistakes

  • Treating it as a one-time training event instead of re-timing and improving after each changeover.
  • Speeding up the change but skipping the first-piece approval, which brings defects back.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →