Shot weight
Shot weight is the total weight of plastic injected in one moulding cycle, adding up all the parts and the runner system.
What it means
A shot is everything the machine injects in a cycle. Weighing it shows whether the process is steady, since a change in weight means a change in fill or packing. It also feeds the material plan: shots per hour times shot weight gives the kilograms used. The shot weight must also lie within the machine's rated capacity, and a machine that is much too large for the shot may degrade the material in the barrel.
Example
A 2-cavity mould makes two 45 g crates handles with a 10 g runner, so the shot weight is 100 g. At 180 shots an hour, the machine uses 18 kg of resin an hour. Over a 20-hour day that makes 360 kg, which the store uses to plan the daily issue.
Records and checks
- Record the shot weight at set intervals, with the part weights, the runner weight and the time of each sample.
- Verify that the shot weight stays within the control limits and that it is within the machine's capacity.
- The operator weighs the shot, the quality inspector reviews the sheet, and the planner uses the weight to forecast material.
Common mistakes
- Treating shot weight and part weight as the same number.
- Selecting a machine much larger than needed, so plastic sits too long in the barrel.