SMV
SMV is the standard minute value, the time in minutes a trained operator should take to do an operation or make a garment at a standard pace.
What it means
In garment factories SMV is the common unit for work content. Operations are timed, rated against standard pace, and allowances for fatigue and personal needs are added. Total garment SMV drives costing, target setting, line balancing and efficiency. It is often written as "garment SMV 12.5" meaning 12.5 standard minutes of work in one piece.
Example
A shirt with SMV 18 is made by a line of 40 operators working 480 minutes each at 70 percent efficiency. Output equals 40 times 480 times 0.7 divided by 18, or about 746 shirts a day.
Records and checks
- Record the SMV for each style and operation with the date, method and who set it.
- Verify the SMV by timing a few operations on the actual line.
- The industrial engineer sets it; the production and costing heads rely on it.
Common mistakes
- Using an SMV from a similar style with a different stitch or fabric.
- Never revisiting the SMV after a method improvement or a change of machines.