Solar payback
Solar payback is the number of years it takes for the savings from a solar system to equal what was spent installing it.
What it means
Divide the net installed cost by the yearly saving. The saving is the power generated and used, multiplied by the unit rate you would have paid, minus yearly upkeep. Include any incentive or tax benefit only if confirmed. A shorter payback means a quicker recovery. Panel output falls slowly each year and tariffs change, so the figure is an estimate and worth revisiting.
Example
A 50 kWp installation costs ₹24,00,000 and produces about 76,000 units a year. At ₹8 a unit, the gross saving is ₹6,08,000. After ₹30,000 upkeep, saving is about ₹5,78,000, so payback is roughly 4.2 years.
Records and checks
- Record the full installed cost, upkeep, yearly generation, and the unit rate saved.
- Verify the yearly savings against real bills, not the quotation's promise.
- The owner and accountant review the payback each year and revise the estimate.
Common mistakes
- Leaving out upkeep, cleaning and inverter replacement from the calculation.
- Counting exported units at the full rate when the utility pays less.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →