Solar generation
Solar generation is the amount of electricity a solar plant produces over a given time, measured in kilowatt hours on its generation meter or inverter.
What it means
It depends on the plant's size, sunshine, panel angle, shade, dust, temperature and inverter health. As a rough guide, a well placed system in much of India produces around four to five units per kWp on a good day, though monsoon months give less. Tracking it daily shows when something has gone wrong, such as a tripped inverter or a dirty array.
Example
A 50 kWp plant on a warehouse in Jodhpur should give about 210 units a day. The log shows only 150 units for a week in March. A cleaning crew removes dust and the output returns to 205 units.
Records and checks
- Record daily generation in kWh, weather notes, and the dates of cleaning and faults.
- Verify the inverter reading against the generation meter and against expected output.
- The maintenance head reviews the log weekly and calls the installer on any unexplained drop.
Common mistakes
- Trusting the inverter display without comparing it with the utility's meter.
- Comparing a monsoon month with a summer month and thinking something is wrong.