lamp.
ResourcesPricingAbout

SPC

SPC, or statistical process control, is the use of control charts and simple statistics on production measurements to keep a process stable and predictable.

What it means

Shop-floor people usually meet SPC as a chart on the wall. The operator measures a few pieces at regular intervals, plots the average and the range, and compares them with control limits calculated from the process itself. Points outside the limits, or a run of points on one side, signal that something has changed and needs checking before defects appear.

Example

At a pin-grinding station, the operator takes five readings every hour and plots the average on a chart. For four hours the average drifts upward, still inside tolerance but toward the upper control line. She calls the supervisor, who finds the wheel is wearing. The wheel is dressed and no pin is rejected.

Records and checks

  • Record each subgroup's readings, the plotted points, the control limits and any action taken.
  • Verify that gauges are calibrated and measurements are taken consistently.
  • The operator plots, the supervisor reacts, and the quality engineer reviews charts weekly.

Common mistakes

  • Plotting points but not acting when the chart shows a trend.
  • Setting control limits equal to the customer tolerance instead of the process's own variation.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →