Standard minute value
Standard minute value is the time, in minutes, that a trained operator working at a standard pace needs to complete a task, including agreed allowances.
What it means
It is found by timing each operation of a style several times, rating the operator's pace against a standard, averaging, and adding allowances. Alternatively, it is built from predetermined motion times. It converts work into minutes that can be compared across styles. A labour cost per minute then turns it directly into a labour cost per garment.
Example
At ₹3.20 labour cost per minute, a garment of 14 standard minutes carries ₹44.80 of sewing labour. If the buyer pushes price down by ₹5, the maker checks whether the minute value can be reduced by better method.
Records and checks
- Record the operation, method, observed times, rating and allowances.
- Verify the result with a second timing by another person.
- The industrial engineer owns it; costing uses the approved value.
Common mistakes
- Timing only the fastest operator and calling it standard.
- Forgetting allowances, so targets cannot be reached.