lamp.
ResourcesPricingAbout

Tool change

A tool change is the replacement or swap of a cutting tool, insert or die on a machine, either planned by expected tool life or forced by wear, breakage or a new job.

What it means

Changing too late leaves poor finish or oversize parts. Many shops change inserts by count of pieces or minutes of cutting, and note the reason when a tool is changed early.

Example

A machine shop uses a carbide insert on mild steel shafts and changes it every 180 pieces. One shift changes it at 90 pieces after a chipped edge. The operator logs "breakage", and the supervisor checks the material hardness on that lot.

Records and checks

  • Record the machine, tool code, pieces made since the last change, reason for change and the time taken.
  • Verify that the replaced tool is the correct code and that the first piece after the change is measured.
  • The operator logs it, and the supervisor reviews early changes for patterns.

Common mistakes

  • Changing tools by feel only, with no record, so nobody can tell if a new insert brand is really better.
  • Skipping the first-piece check after the change and running a full batch off-size.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →