Trims and accessories
Trims and accessories are the non-fabric items used on a garment, such as buttons, zips, labels, elastic, drawcords, tags and packing materials.
What it means
Trims are items that go onto the garment itself and accessories often include packing items such as hangers, polybags and cartons. Each needs a specification, a supplier, an approved sample and a quantity per garment with an allowance for loss. A late or wrong trim can hold up a whole shipment, even when fabric and sewing are ready.
Example
A 5,000 piece jacket order in Ludhiana needs 5,000 zips and 30,000 buttons. The zips arrive in the wrong tape colour, so the supplier replaces them in 4 days at its cost, and the factory moves its sewing schedule.
Records and checks
- Record specification, supplier, approved sample, quantity received and issue.
- Verify the received item against the approved sample and count it.
- Stores checks the count; quality checks the match to specification.
Common mistakes
- Accepting trims without comparing them to the approved sample.
- Not allowing for loss, so the last few hundred garments cannot be finished.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →