lamp.
ResourcesPricingAbout

Washing process

The washing process is the treatment of finished or semi-finished garments in water with chemicals, enzymes or stones to soften, fade, or remove sizing, before finishing.

What it means

Common types include normal wash, enzyme wash, stone wash and bleach or fade effects, mostly on denim and some knits. Each has a recipe: time, temperature, chemicals and load size. Washing changes shrinkage, shade and hand feel, so the buyer approves a wash standard first. Variation between batches is a frequent source of complaints.

Example

A denim maker in Ahmedabad washes 600 pairs per load and gets a lighter result in the bottom of the drum. The wash master reduces the load to 500 and standardises the time, and shade variation drops.

Records and checks

  • Record recipe, load, time, temperature, batch and the approved standard.
  • Verify each batch against the approved wash sample for shade and feel.
  • The wash master controls the recipe; quality passes the batch.

Common mistakes

  • Changing a recipe without recording it, so the result cannot be repeated.
  • Washing before testing shrinkage, so cutting allowances are wrong.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →