Water consumption
Water consumption is the total volume of water a site draws from all sources, such as the municipal line, borewell and tanker, in a given period.
What it means
It is usually tracked in kilolitres per day or month and often compared with output, for example litres per kilogram of product. Rising use with flat production usually points to a leak, an open valve or a worn pump. Many sites draw from several sources, so a true figure needs each source counted, not just the municipal bill.
Example
A dairy unit uses 180 kilolitres a month from its borewell and 60 from tankers at ₹120 per kilolitre. When the total jumps to 290 with the same milk volume, the maintenance team finds a leaking cooling line.
Records and checks
- Record opening and closing meter readings and tanker deliveries, with dates and source.
- Verify the total against the bills and against production, to catch unexplained jumps.
- The maintenance or plant head reviews it monthly and investigates any rise above the usual range.
Common mistakes
- Counting only the municipal supply and ignoring borewell and tanker water, which hides the real use.
- Reading the meter irregularly, so a leak runs for weeks before anyone notices.