Weld joint
A weld joint is the point where two or more metal parts are joined by welding, described by how the parts meet, such as butt, lap, tee, corner or edge.
What it means
The joint type decides how edges are prepared, how much filler is needed and how the load passes. A butt joint joins two parts end to end and often needs bevelled edges on thicker plate. A fillet weld sits in the corner of a tee or lap joint.
Example
A fabricator joins a 12 mm base plate to a column in a tee joint with a 6 mm fillet weld all round. The same plate joined end to end with another plate would need a bevelled butt joint, which takes more preparation and filler.
Records and checks
- Record the joint type, weld size, process, filler metal and the drawing reference for each joint.
- Verify fit-up gap, edge preparation and cleanliness before welding starts.
- The welder checks fit-up, and the inspector checks size and finish against the drawing.
Common mistakes
- Welding with a wide gap that is filled with extra weld metal, which adds distortion and cost.
- Reading the weld symbol wrongly and making the weld on the wrong side of the joint.