Work centre
A work centre is a machine, or a group of similar machines and workers, treated as one unit for scheduling, capacity planning and cost calculation.
What it means
Planners need a manageable level of detail. Instead of tracking every spanner and operator, they group resources that do the same kind of work: lathes, welding bays, a paint booth. Each work centre has a capacity in hours per day, a cost rate per hour and a calendar. Routings refer to work centres, so a job knows where it goes. Machines that are very different in capability should not be pooled together.
Example
A Jalandhar auto-parts shop has six lathes, but two are older and cannot hold tight tolerances. It makes two work centres: CNC turning with four machines at ₹650 per hour, and conventional turning with two machines at ₹380 per hour. A precision job is routed only to the first.
Records and checks
- Record the work centre name, machines in it, hours available per day and hourly cost rate.
- Verify the available hours after breaks, maintenance and shift patterns, and review the rate annually.
- The production head defines them; accounts confirms the cost rates and planning confirms the capacity.
Common mistakes
- Grouping dissimilar machines, so the plan assigns jobs a machine cannot do.
- Defining too many, which makes planning slow and the capacity figures meaningless.