lamp.
ResourcesPricingAbout
10-minute system

What should be checked before dispatch?

Six checks, done one day ahead, that stop most late dispatches.

lamp guide5 min read

The six checks

  • Production complete for the full quantity
  • Quality released
  • Packing done and labelled
  • Invoice and e-way bill ready
  • Vehicle confirmed with a time
  • Customer delivery instructions confirmed

Do it the day before

Checking on the day of dispatch leaves no time to fix anything. Check at 3 pm the day before, so documents and transport can be arranged.