lamp.
ResourcesPricingAbout

Orders are ready but not dispatched

Check production, quality, packing, documents and transport together.

01 · What is usually happening?

Production says the order is done. The order still has not left, because one of five small things is missing.

Most late dispatches come from the last 10 percent: packing, documents, release or a truck.

The question people usually ask“Why has it not gone?”
The more useful question“What is still missing for this order, and who is getting it?”
02 · Common causes
  1. 01Packing material not planned
  2. 02Final release pending
  3. 03Invoice or e-way bill not ready
  4. 04Transport booked too late
  5. 05Short quantity after final inspection
  6. 06Customer delivery instructions unclear
03 · What to check now0 of 6 checked
04 · What good looks like
  1. 01Readiness checked one day before dispatch.
  2. 02Documents prepared in parallel with packing.
  3. 03Transport booked against the dispatch plan.
  4. 04One person owns the dispatch list.
05 · Where this connects

This rarely stays in one department

What it can lead to: A promised date missed by one day, for want of one document.

Start from a problem
Work flows left to right, top to bottomKEYMost important for manufacturing

These support every part of the business

Problem

Dispatch held up

Usually connected to

How it spreads

  1. Packing
  2. Documents
  3. Truck
  4. Customer

What it can lead to: Goods are ready but the order still ships late.

lamplamp can check packing, documents and transport a day ahead.
08 · lamp

lamp could keep this moving

lamp is not available yet. These are things it is being built to do.

  • lamp could check each dispatch a day ahead.
  • lamp could chase the transporter for confirmation.
  • lamp could tell accounts which invoices to prepare.
Does your business handle this differently?Tell us what we have missed: a cause, a check, or a better way of handling it.
Suggest an addition