Design-to-launch: role and approval matrix

This matrix settles who decides what during a product or service launch: starting the project, changing the specification, buying trial material, releasing a pilot batch, approving the price and giving the final go. Owners and project leads use it so that decisions are made by the right person, on time, and with a record.

When to use it

Prepare it at the start of any launch and keep it with the project folder. Revisit it when a decision was delayed because nobody was sure who could approve, or when someone new joins the design, quality or purchase team.

The template

DecisionProposed byReviewed byApproved byLimit in ₹Record kept
Start the projectRequesterAccounts leadOwnerDesign and trial budget of ₹ __Signed request form
Fix the specificationDesign leadQuality lead and sales headOwnerNot applicableSpecification with version and date
Change after specification is fixedAnyone on the projectDesign lead and accounts leadProject lead, or Owner if cost or date changesAbove ₹ __ extra costChange log entry
Buy trial materialPurchase leadDesign leadProject leadUp to ₹ __ per orderPurchase order
Release a pilot batchOperations headQuality leadOwnerBatch above ₹ __Pilot release note
Set the selling priceSales headAccounts leadOwnerPrice below the minimum in the briefPrice approval note
Launch go or no-goProject leadQuality, accounts, operations leadsOwnerNot applicableLaunch approval note
Stop or withdraw the productQuality lead or OwnerAccounts leadOwnerNot applicableDated written decision

How to fill it

  • Decision: add any decision particular to your product, such as a trial at a customer site.
  • Proposed by, Reviewed by and Approved by: use role titles with a name beside each, and make sure the approver is never the only reviewer.
  • Limit in ₹: fill the blanks with figures that match your margin and cash. Keep them in numbers, and review them once a year.
  • Record kept: the exact document that shows the decision, so it can be found years later.
  • Where a decision involves regulated labelling, licences or tax treatment, check the current rule on the official portal or with your CA before acting.

Example row

DecisionProposed byReviewed byApproved byLimit in ₹Record kept
Buy trial materialAnil (Purchase lead)Ritu (Design lead)Project leadUp to ₹ 12,000 per orderPO 2201 for 40 kg of resin dated 18 Oct 2026

Review and sign-off

  • The owner signs and dates the matrix at the start of the project and shares it with everyone named.
  • Review at each launch, and during the project if a decision stalls.
  • Escalate when a decision is taken without the named approver, when reviewers disagree on a safety or quality point, or when spending would cross the project limit.

Keeping it up to date

  • Keep each version with its date, so you can show who was allowed to approve at any point.
  • Update limits and names the same day roles change, and tell the team.
  • Retain the matrix and the records it points to for the period your CA or the law requires.