Design-to-launch: role and approval matrix
This matrix settles who decides what during a product or service launch: starting the project, changing the specification, buying trial material, releasing a pilot batch, approving the price and giving the final go. Owners and project leads use it so that decisions are made by the right person, on time, and with a record.
When to use it
Prepare it at the start of any launch and keep it with the project folder. Revisit it when a decision was delayed because nobody was sure who could approve, or when someone new joins the design, quality or purchase team.
The template
| Decision | Proposed by | Reviewed by | Approved by | Limit in ₹ | Record kept |
|---|---|---|---|---|---|
| Start the project | Requester | Accounts lead | Owner | Design and trial budget of ₹ __ | Signed request form |
| Fix the specification | Design lead | Quality lead and sales head | Owner | Not applicable | Specification with version and date |
| Change after specification is fixed | Anyone on the project | Design lead and accounts lead | Project lead, or Owner if cost or date changes | Above ₹ __ extra cost | Change log entry |
| Buy trial material | Purchase lead | Design lead | Project lead | Up to ₹ __ per order | Purchase order |
| Release a pilot batch | Operations head | Quality lead | Owner | Batch above ₹ __ | Pilot release note |
| Set the selling price | Sales head | Accounts lead | Owner | Price below the minimum in the brief | Price approval note |
| Launch go or no-go | Project lead | Quality, accounts, operations leads | Owner | Not applicable | Launch approval note |
| Stop or withdraw the product | Quality lead or Owner | Accounts lead | Owner | Not applicable | Dated written decision |
How to fill it
- Decision: add any decision particular to your product, such as a trial at a customer site.
- Proposed by, Reviewed by and Approved by: use role titles with a name beside each, and make sure the approver is never the only reviewer.
- Limit in ₹: fill the blanks with figures that match your margin and cash. Keep them in numbers, and review them once a year.
- Record kept: the exact document that shows the decision, so it can be found years later.
- Where a decision involves regulated labelling, licences or tax treatment, check the current rule on the official portal or with your CA before acting.
Example row
| Decision | Proposed by | Reviewed by | Approved by | Limit in ₹ | Record kept |
|---|---|---|---|---|---|
| Buy trial material | Anil (Purchase lead) | Ritu (Design lead) | Project lead | Up to ₹ 12,000 per order | PO 2201 for 40 kg of resin dated 18 Oct 2026 |
Review and sign-off
- The owner signs and dates the matrix at the start of the project and shares it with everyone named.
- Review at each launch, and during the project if a decision stalls.
- Escalate when a decision is taken without the named approver, when reviewers disagree on a safety or quality point, or when spending would cross the project limit.
Keeping it up to date
- Keep each version with its date, so you can show who was allowed to approve at any point.
- Update limits and names the same day roles change, and tell the team.
- Retain the matrix and the records it points to for the period your CA or the law requires.