lamp.
ResourcesPricingAbout

Cavity balance

Cavity balance is the condition in which all cavities of a multi-cavity mould fill evenly, so that each part in the same shot has the same weight and dimensions.

What it means

In a mould with several cavities, plastic reaches each one through runners. If the paths differ in length or size, some cavities fill first and others later, giving parts that vary in weight, flash or short fill. A balanced runner layout and gate sizing equalise the flow. Balance is tested by weighing parts from each cavity and by short-shot trials that show the fill pattern.

Example

A 4-cavity cap mould makes caps with a target weight of 3.2 g. Weighing a shot gives 3.20, 3.21, 3.19 and 3.38 g. Cavity 4 is overfilled and flashes. The tool room adjusts the gate on cavity 4, and the next sample reads 3.20 for all four.

Records and checks

  • Record the weight of parts from each cavity, with the cavity number, the date and the process settings used.
  • Verify that the spread between cavities stays within the tolerance agreed for that part.
  • The operator weighs the shot, the quality inspector confirms, and the tool room adjusts when drift appears.

Common mistakes

  • Averaging the shot weight and missing that one cavity is far off.
  • Fixing the imbalance by raising the pressure instead of correcting the gate or runner.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →