Corrective maintenance
Corrective maintenance is work done to repair or restore equipment after a fault or defect has been found, so that it works as required again.
What it means
The trigger is a known problem: a machine stopped, a leak was seen or an inspection found a worn part. The work can be urgent, as in a breakdown, or planned for the next shutdown if the machine still runs safely. It differs from preventive maintenance, which acts before any fault is found. Good corrective work finds the cause and repairs that, not just the visible symptom.
Example
During a weekly check, a technician finds a conveyor belt fraying at the edge. The belt is still running, so a ₹6,500 replacement is scheduled for Sunday instead of waiting for it to snap on a working day.
Records and checks
- Record the fault found, who found it, the repair made, parts used, time taken and the date closed.
- Verify that the machine passes a trial run and that the fault does not return in the following weeks.
- The technician logs the job; the supervisor signs it off after testing.
Common mistakes
- Closing a repair without testing the machine under load.
- Not recording the cause, so repeat faults look like new ones.