Diagnostic requisition
A diagnostic requisition is the request, usually signed by a doctor, telling a laboratory or imaging centre which tests to perform on which patient.
What it means
It starts the work in a diagnostic centre. The requisition names the patient, age and sex, the tests ordered, the referring doctor, the clinical note and any urgency such as a same-day report. The lab uses it to bill, to choose the sample tube, and to match the report to the right person. A missing test or wrong age can lead to a wrong reference range.
Example
A physician orders a lipid profile, HbA1c and thyroid panel for a 52-year-old man. The collection centre checks that three tests appear on the form, draws the right tubes, and marks the fasting status before sending the samples to the main lab.
Records and checks
- Record patient details, ordered tests, doctor's name and registration, date and time, and urgency.
- Verify the patient's name and age on the form against the sample label.
- The registration desk enters the order and the lab supervisor checks any unclear handwriting before processing.
Common mistakes
- Accepting a verbal test request without a written order, which makes disputes hard to settle.
- Adding tests at the counter without recording who authorised them.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →