lamp.
ResourcesPricingAbout

Fabric consumption

Fabric consumption is the amount of fabric, in metres or kilograms, used to make one garment, including pattern pieces, cutting loss and agreed allowances.

What it means

It is the base for costing and buying. Planners estimate it from the marker length per garment, then add allowances for end losses, fabric defects and shrinkage. After production, the actual figure is compared with the estimate. A gap of even 2 percent on a large order is a real cost, so it is watched closely.

Example

A shirt is costed at 1.55 metres of fabric. On an order of 5,000 shirts at ₹210 per metre, the actual use is 1.62 metres, so the factory loses about ₹73,500 on fabric alone.

Records and checks

  • Record the estimated and actual consumption per style, with the marker and fabric width used.
  • Verify actual fabric issued less returned against pieces cut.
  • Merchandising sets the estimate; stores and cutting confirm actual use.

Common mistakes

  • Estimating consumption using one fabric width and then buying a narrower fabric.
  • Not updating the estimate after the first order shows a different real figure.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →