lamp.
ResourcesPricingAbout

Fabric defect

A fabric defect is a flaw in woven or knitted fabric, such as a hole, slub, stain, broken yarn, barre or shade variation, that lowers its quality or use.

What it means

Defects arise in spinning, weaving or knitting, dyeing and finishing. Some are cut around in the marker, some cause the length to be rejected, and some, like colour variation across a roll, can ruin whole garments. The seriousness depends on the location and size of the flaw and on the buyer's acceptance limit. Defects found late cost much more than ones found at receiving.

Example

During inspection at a Surat export unit, a roll of 120 metres shows a streak every 4 metres along the length. The roll is held, the supplier is told, and a ₹26,000 claim is raised before any of it is cut.

Records and checks

  • Record the roll number, defect type, position and length affected.
  • Verify the defect against the buyer's standards and photograph serious ones.
  • Quality inspects incoming fabric; purchase takes up claims with the supplier.

Common mistakes

  • Cutting first and finding the defects at the sewing stage.
  • Accepting a supplier's own inspection report without any spot check.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →