lamp.
ResourcesPricingAbout

Fabric inspection

Fabric inspection is the check of received fabric rolls for defects, width, length, shade and weight before the cloth is approved for cutting.

What it means

Rolls are passed over a lit inspection frame at a fixed speed while the inspector marks flaws. The result is scored using a system such as the four point system and compared with the buyer's limit, with the length and width also measured. Passing rolls go to stores, failing ones are held or returned. It is cheaper to find a problem here than after cutting.

Example

A woven bottoms maker in Bhiwandi inspects 10 percent of 800 rolls on receipt, and finds 14 of 80 rolls over the limit. It decides to inspect all rolls and returns 31 of them, worth ₹2.3 lakh.

Records and checks

  • Record the roll number, length, width, defects, score and decision.
  • Verify the inspected length against the supplier's packing list.
  • The quality inspector reports to quality head; purchase acts on rejections.

Common mistakes

  • Inspecting in poor light, so flaws are missed.
  • Inspecting without recording roll numbers, so rejected rolls cannot be traced.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →