Fabric GSM
Fabric GSM is the weight of a fabric in grams per square metre, used as a measure of how heavy, dense and substantial the cloth is.
What it means
A 140 GSM jersey is light and suits summer T-shirts, while a 300 GSM fleece is heavy. Buyers specify a GSM with an allowed tolerance, and the supplier's price depends on it. GSM is measured by cutting a round sample of known area and weighing it. Fabric that is below spec feels thin and may cost the buyer's trust.
Example
A T-shirt order calls for 180 GSM. The incoming roll tests at 165 GSM, which is 8 percent lighter, so the buyer's inspector would reject finished shirts. The factory returns the roll and claims ₹31,000 from the mill.
Records and checks
- Record the specified GSM, tolerance, test result, roll and test date.
- Verify GSM with a calibrated cutter and weighing scale on each lot.
- Quality tests each lot; purchase uses the result in supplier claims.
Common mistakes
- Measuring GSM on a stretched or freshly relaxed sample, which changes the figure.
- Checking only the first roll of a lot of many.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →