lamp.
ResourcesPricingAbout

Fabric shrinkage

Fabric shrinkage is the percentage by which a fabric's length or width reduces after washing, steaming or heat, usually measured on a test piece.

What it means

Cotton and knits often shrink more in length than in width. A test measures marked distances before and after a specified wash, and the result guides pattern allowance or whether to pre-treat the fabric. The buyer typically sets a maximum limit. If shrinkage is not allowed for, finished garments come out short or narrow.

Example

A cotton knit shows 6 percent length shrinkage after wash. The pattern maker adds 6 percent to body length for a T-shirt of 70 cm. Without this, shirts would reach the customer about 4 cm too short.

Records and checks

  • Record the test method, wash conditions, before and after dimensions and result.
  • Verify the same test on each lot, since lots can differ.
  • Quality tests and reports; the pattern maker applies the figure.

Common mistakes

  • Using shrinkage from a previous lot or style for a new fabric.
  • Testing only length and ignoring width, which can also change.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →