lamp.
ResourcesPricingAbout

In-process quality control

In-process quality control is the checking of work and process settings during production, between operations, to catch defects early.

What it means

Instead of waiting for final inspection, a few checks are placed at the points where defects start. These can be operator self-checks, first-piece approval after a setup, periodic sampling and patrol inspection by a quality person. The nearer a check is to the cause, the less material is wasted and the faster the process can be corrected.

Example

A sheet-metal shop punches and bends brackets. After each tool change, the operator makes a first piece, and the inspector checks hole position and bend angle before the batch starts. Every hour a patrol check is done on five pieces. When a die wears, the hole shifts and is caught after 40 pieces, not 4,000.

Records and checks

  • Record first-piece approvals, patrol readings, the time of each check and actions taken.
  • Verify that gauges are calibrated and used correctly at the machine.
  • The quality inspector does patrol checks, and the production supervisor reacts to out-of-limit results.

Common mistakes

  • Skipping first-piece approval on small batches, where the whole lot can be wrong.
  • Recording readings but never acting on a trend toward the limit.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →