Inbound logistics
Inbound logistics is the whole flow of bringing materials from suppliers into the business, covering transport, unloading, receiving, inspection and putting goods into storage.
What it means
It starts when the supplier dispatches and ends when goods are available in stores for use. Decisions include who arranges transport, how often deliveries come, how goods are unloaded and counted, and how quickly they are inspected and stored. Delays and errors at this stage, such as wrong quantities or damaged goods, directly stop production, so it needs the same attention as production itself.
Example
A Tirupur knitwear unit receives yarn from Coimbatore twice a week. Trucks arrive at the gate, the gate clerk records the time, the stores team weighs 40 cones for sampling and compares counts with the challan, and the quality person tests shade. Approved lots go to the racks within four hours; any short quantity is noted on the receipt.
Records and checks
- Record the arrival time, vehicle, challan, quantity received, condition and the inspection result.
- Verify the counts and condition against the challan and order before accepting the goods.
- The gate and stores staff receive; quality inspects and purchasing follows up discrepancies.
Common mistakes
- Signing for goods without counting, so shortages are discovered during production.
- Leaving received goods in the yard or on the dock, where they are damaged or lost.