Machine setup sheet
A machine setup sheet is a one-page record of the tools, fixtures, work offsets, speeds, feeds and checks needed to set up a machine for a specific part.
What it means
It captures what the best setter on the floor knows, so anyone can repeat the setup without guessing. A good sheet names the program number and revision, the tool list with holder numbers, the clamping method, the datum, offset values and the first-piece checks.
Example
A machine shop sets up a pump housing on a machining centre. The sheet says use fixture F-12, tool 4 is a 10 mm drill, the datum is the left-front corner, and measure bore diameter on the first piece. A new operator finishes setup in 40 minutes.
Records and checks
- Record the part number, drawing and program revisions, tool list, fixture number, offsets and inspection points.
- Verify that the sheet matches what is actually on the machine at each setup.
- The programmer or process engineer owns the sheet, and the supervisor signs after the first-piece approval.
Common mistakes
- Writing the sheet once and never updating it after tools or programs change.
- Keeping it only in the programmer's head or phone so the night shift cannot find it.