Material drying
Material drying is heating plastic granules in a dryer before processing, to remove absorbed moisture that would otherwise damage the melt and the finished part.
What it means
Some plastics, including nylon, PET, polycarbonate and ABS, absorb moisture from the air. If moulded wet, the water turns to steam in the barrel and gives splay marks, bubbles, brittle parts and loss of strength. Drying specifies a temperature and a time for each grade, typically in a hopper dryer. Resin must then be used before it takes up moisture again.
Example
A unit moulds nylon gear housings and finds silver streaks and brittle parts. The dryer log shows only 1 hour of drying instead of the 4 hours given in the supplier's data sheet. After re-drying the resin for 4 hours at the stated temperature, streaks vanish and rejections fall from 9 to 1 percent.
Records and checks
- Record the material, dryer temperature, drying time, start and end times and the lot dried.
- Verify the dryer is working by checking the temperature and, where possible, the moisture reading before use.
- The operator loads and logs, the supervisor checks the time before release, and quality reviews streak and brittleness defects.
Common mistakes
- Using a bag opened last week without drying it again.
- Raising the dryer temperature to save time, which can discolour or degrade the resin.