Motor efficiency

Motor efficiency is the percentage of the electrical power a motor draws that is delivered as useful mechanical power at the shaft.

What it means

The rest of the input is lost as heat, friction and magnetic losses. Standard industrial motors are commonly in the range of 85 to 95 percent at good load, but efficiency drops when a motor is lightly loaded, badly rewound or poorly maintained. Because motors run for thousands of hours, a few percentage points matter. Efficiency labels help when choosing a replacement.

Example

A 15 kW motor on a ventilation fan in Pune runs at only 35 percent load because it was oversized. Its efficiency is low and its power factor poor. Changing to a 7.5 kW motor saves around ₹32,000 a year at the unit rate.

Records and checks

  • Record the motor's rated efficiency, rated power, measured load current and running hours.
  • Verify the load by measuring current and comparing with the nameplate, not by guess.
  • The electrical in charge flags motors loaded below half and drafts a replacement plan.

Common mistakes

  • Rewinding a motor repeatedly, which tends to reduce its efficiency each time.
  • Buying a bigger motor "for safety", then running it lightly loaded.