Mould change

A mould change is the replacement of one mould or die in a moulding machine with another so that a different product can be made.

What it means

It involves stopping the machine, removing the old mould, fitting the new one, connecting water and hydraulics, setting parameters and running trial shots until parts are good. Production is lost throughout. Long changes make short batches uneconomical, so plants prepare the next mould in advance and standardise clamps.

Example

A plastics unit changes the mould on a 150-ton machine every Thursday. The change takes 4 hours, in which the machine would have made 600 bottle caps an hour at ₹1.20 each, so about ₹2,900 of sales is lost each time, before scrap from trial shots.

Records and checks

  • Record the mould number, start and finish time, trial shots used, parameters and operator.
  • Verify the mould is clean, cooling lines are connected and first parts pass first piece inspection.
  • The setter performs it; the supervisor approves the first good piece before the run.

Common mistakes

  • Starting a long run on the first acceptable part without checking it against the drawing.
  • Leaving the old mould dirty or unprotected after removal, which damages it before the next use.