Mould maintenance
Mould maintenance is the planned cleaning, lubrication, inspection and repair of a mould, usually scheduled by the number of shots, to keep parts consistent and avoid breakdowns.
What it means
A mould is the costliest asset on a moulding floor and is worked hard. Over time vents clog, parting lines wear, ejector pins stick and cooling channels scale up. Preventive maintenance cleans and checks these at set shot intervals, while corrective maintenance fixes what has failed. Good records show which moulds are costing money and when a mould needs refurbishment.
Example
A 4-cavity mould has a service interval of 100,000 shots. At 100,000 the tool room cleans the vents, replaces two worn ejector pins and descales the cooling lines. The shot counter is reset and the log notes a slight wear at the parting line, to be watched at the next service.
Records and checks
- Record the mould ID, shot count, date, work done, parts replaced and the person who did it.
- Verify that the mould is cleaned and tested before it goes back into storage and again before its next use.
- The tool room performs the work, the supervisor signs it, and the production head reviews moulds that fail early.
Common mistakes
- Running the mould until it breaks, then paying for a long stoppage and an urgent repair.
- Putting a mould away dirty or without rust protection.