lamp.
ResourcesPricingAbout

Pick ticket

A pick ticket is a document or print-out for one order that tells the warehouse what to collect, from where, and for whom the goods are meant.

What it means

Pick ticket and pick list are close, and some firms use them interchangeably. In many warehouses a pick ticket belongs to one order and also carries the customer name, order number, ship-to address, priority and any packing note. It travels with the goods through picking, checking and packing, so the person at each step knows what the order must contain.

Example

A tile dealer's pick ticket for a contractor lists 60 boxes of one shade in lot B14, with the site address and "deliver before 11 am" written on it. The picker pulls the pallet, the checker ticks the lot number, and the loader reads the ticket to put it on the right truck.

Records and checks

  • Record the order number, items, quantities, lot or batch, bin locations, picker and checker names.
  • Verify that the lot on the pallet matches the lot written on the ticket, especially for shades, dates and batches.
  • The picker signs on collection, and a second person at packing confirms the contents.

Common mistakes

  • Issuing two tickets for the same order, so stock is picked twice and one set sits unclaimed on the floor.
  • Throwing the ticket away after packing, losing the only record of who picked and checked.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →