lamp.
ResourcesPricingAbout

Process capability

Process capability is the ability of a stable process to produce output that stays within the specified limits, usually expressed through indices such as Cp and Cpk.

What it means

Every process varies. Capability compares that natural variation with what the customer will accept. It is only meaningful when the process is stable, meaning no drifting or sudden shifts, and when the measuring system is reliable. A capable process needs little sorting or rework.

Example

A plastic injection shop measures wall thickness on 100 consecutive parts for a customer who asks for a Cpk of at least 1.33. The result is 1.05, with most of the variation tied to mould temperature. After adding a temperature controller, a second study gives 1.48, and the customer approves the part.

Records and checks

  • Record the characteristic, the sample, the measurement system, the control chart and the resulting indices.
  • Verify stability first, with a control chart, before calculating capability.
  • The quality engineer runs the study, and the production head acts on the findings.

Common mistakes

  • Calculating capability on data from an unstable process, which gives a misleading number.
  • Using a gauge whose own variation is a large part of the tolerance.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →