Process FMEA

A process FMEA is a structured analysis of each manufacturing or service step, listing possible failures, their effects and the controls that prevent or detect them.

What it means

It focuses on what could go wrong in the process, such as a wrong setting, a missing part, an operator error or a worn tool, rather than on the design of the product. Each failure is rated for severity, occurrence and detection, and the highest risks get corrective action. The conclusions feed directly into the inspection plan, setup sheets and operator training, so the paperwork changes what happens on the floor.

Example

At a Hosur spring maker, the coiling step has a failure mode of wrong wire diameter loaded. The effect is springs with the wrong load rating reaching the customer. Controls were only a visual check. The team adds a go/no-go gauge on the wire and a lot-verification sign-off before each coil changeover.

Records and checks

  • Record each process step, its failure modes, ratings, existing controls and agreed actions.
  • Verify that the actions appear in the control plan and operator instructions, not just in the table.
  • The process engineer prepares it; the quality head and production head review and approve.

Common mistakes

  • Rating detection highly because an inspection exists, without checking it actually catches the failure.
  • Completing it once and never revisiting it after a customer complaint or a process change.