Process flow diagram

A process flow diagram is a picture of the steps in making a product in sequence, showing operations, movements, inspections, storage and the inputs and outputs of each.

What it means

Drawing the flow forces everyone to agree how work is actually done, not only how it is supposed to be done. Boxes or symbols represent operations, checks, transport and waiting, joined by arrows. Once it is on paper, duplicated handling, long waits and missing inspection points become obvious. It also forms the base for risk analysis and the inspection plan.

Example

For a bakery making 2,000 buns a day in Mysuru, the flow runs from flour receipt and weighing, through mixing, proofing, baking, cooling, packing and dispatch. Drawing it reveals the trays travel 40 metres between the oven and the packing table, and cooling shelves sit in the walkway, which causes a 20-minute delay.

Records and checks

  • Record each step, its input, output, location and the check performed there, with the version date.
  • Verify the diagram by walking the shop floor, comparing it with what actually happens.
  • The process owner draws it; operators confirm it is accurate and quality reviews inspection points.

Common mistakes

  • Drawing it from the manual in the office, so the actual shortcuts and rework loops are missing.
  • Making it so detailed it cannot be read, hiding the main flow under minor movements.