lamp.
ResourcesPricingAbout

Regrind

Regrind is plastic scrap, such as sprues, runners and rejected parts, that has been ground into small granules for reuse alongside fresh material.

What it means

Instead of throwing away runners and rejects, many plants grind them and blend a controlled share back into the next batch. This lowers material cost. But reground plastic has been through heat once already, so its properties can be slightly weaker, and dust or contamination can spoil parts. It must be clean, dry, of the same grade and colour, and used within limits set by the product's requirements.

Example

A moulder of PP storage boxes grinds its runners and rejects, about 3 kg every hour. The material is stored in a labelled bin and blended at 20 percent with fresh resin on the same grade. At ₹110 a kg, reusing 3 kg an hour over 16 hours a day saves about ₹5,000 a day.

Records and checks

  • Record the weight of regrind produced, the grade, colour, the blend ratio used and the batches it went into.
  • Verify that regrind is clean and dry, and test finished parts for strength and appearance when the ratio rises.
  • The operator grinds and labels, the supervisor controls the blending, and quality approves the ratio for each product.

Common mistakes

  • Regrinding material that has been contaminated or degraded, and blending it into good lots.
  • Blending by eye so the ratio changes from shift to shift.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →