lamp.
ResourcesPricingAbout

Sample accession

Sample accession is the laboratory's formal receipt of a specimen, where it is checked against the test order and given a unique lab number.

What it means

Accessioning is the gate between collection and testing. A technician confirms that the container, label, volume and condition suit the ordered tests, then logs the arrival time and assigns the number that will follow the sample through analysis and the final report. Anything wrong, such as a missing label, is flagged here before work begins.

Example

A courier delivers 62 tubes from three collection centres at 10:20 am. The accession desk scans each barcode against the order list, finds one tube with no name, holds it aside, calls the centre and logs the other 61 with received times.

Records and checks

  • Record the lab number, received time, courier, source centre, sample type and condition.
  • Verify the label, test order and tube type match before the sample moves to the bench.
  • The accession technician logs receipt and the lab supervisor reviews held or mismatched samples daily.

Common mistakes

  • Skipping the match against the order when the queue is long, so a wrong tube is tested.
  • Not logging the received time, which makes turnaround delays impossible to trace.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →